GetSmart Blog

76 Results for Tag Customer Success Story

ETI Engineering: Why We Choose CADWorx ETI design manager Greg Silva tells why he uses CADWorx for piping: "I can design three or four different scenarios and see which one works the best.”
Download the May Golden Valve Desktop Calendar

Download the May Golden Valve Desktop Calendar featuring Hyundai Engineering, Korea.

Samsung Heavy Industries Builds World's Largest Containership with Intergraph Smart 3D SHI has enjoyed the benefits of Smart 3D since 2004, recording schedule reductions of up to three months on major shipbuilding projects, thanks to the solution’s intelligent early design features.
Construction Partner Forum at HxGN LIVE Will Deliver Big ideas Attendees at this June 13 event in Las Vegas will be able to build their own roadmap to construction delivery success by gauging where they are today within the evolution of construction-related technology.
 
Download April Golden Valve Desktop Calendar Download this month's Golden Valve Desktop Calendar, featuring Eduardo E. Espinoza Muñiz, Cerrey, S.A. de C.V. | Mexico.
Customer Success: SRC and Intergraph's Ideal Ecosystem Watch Singapore Refining Company’s video testimonial, which explains how Intergraph software solutions were perfect to support its operations on Jurong Island.
Koreas ISU Chemical Moves to Smart Factories with SmartPlant Enterprise

Company demonstrates how Intergraph SmartPlant solutions can be applied to plant operations in the petrochemical industry.

Doosan Heavy Industries & Construction Optimizes with Intergraph Smart Construction This case study explains how leading Korean EPC Doosan Heavy Industries & Construction achieved significant gains in project visibility, materials management, and decision-making capabilities using Intergraph Smart Construction.
How L&T Valdel Reduced Man-hours on Offshore Loading Facility L&T- Valdel (LTV) was awarded a subcontract to design internal turrets for two offshore FPSO facilities. Using Intergraph CAESAR II, the company saved 80 percent of man-hours on slug force calculations alone compared to manual methods. 
L&T Chiyoda Leverages CAESAR II for Malaysia Refinery Project LTC’s Larsen & Toubro Heavy Engineering Division (LTHED) was tasked with tight deadlines on the project with operating temperatures up to 900 degrees Celsius.