ENEX Optimizes Power Plant Design with Intergraph PP&M Technologies

Po Case Study - Enex

Read the entire case study here. 

In 2010, ENEX’s Rostovteploelectroproekt design subdivision needed a software solution to design: 

  • Novocherkasskaya hydroelectric power station, power unit No. 9 with circulating fluidized bed boiler installation (nominal power 330MW)
  • Steam-turbine compartment with the capacity of 24 MW within a hydrocracking system at Rosneft Achinsk Refinery

Interoperability and efficiency are fundamental for thorough and accurate power unit design. Rostovteploelectroproekt chose Intergraph solutions for the project to ensure the quality and consistency of design and data.

Learn how SmartPlant P&ID, SmartPlant Instrumentation, SmartPlant Electrical, Intergraph Smart 3D, and SmartPlant Foundation enabled the company to implement automatic tracking of change among all the disciplines, generate tasks to all related disciplines, and track the coordination the tasks among all the design team members. Read the entire case study.