Gas Mega-project in the Middle East - from Insight Magazine issue 36

BP_map

CADWorx used for BP’s Shah Deniz 2 project, one of the world’s largest gas developments

Process Group works with some of the world’s leading owner operators to deliver projects across the oil and gas production, refining, petrochemical and carbon capture industries. It maintains fully integrated sales, design, engineering and fabrication facilities in Australia and the United Arab Emirates (UAE), allowing the same team to control entire projects – from concept design through to final manufacture and commissioning – from one site.

Process Group is currently engaged on BP’s Shah Deniz 2 project in the Caspian Sea region – one of the largest gas developments in the world. When complete, the project will be responsible for delivering six billion cubic metres per year (bcma) of gas to Turkey, and a further 10 bcma to markets in Europe. The current concept for Shah Deniz Stage 2 includes 500 km of subsea pipelines, which will link 26 gas production wells with the onshore terminal. The design for the project was executed in Australia and the fabrication in the UAE.

To read the full article from Insight issue 36, click here.

 

Categories:
Tags: