PT. Green Gold Engineering Reaches Productivity with Intergraph Smart 3D, Smart P&ID

PT. Green Gold Engineering, case study, Jakarta, Indonesia

PT. Green Gold Engineering (GGE) is a leading engineering, procurement, construction management (EPCM) partner in Southeast Asia’s mining and minerals industry. The company delivers a complete solution for new and existing mining projects of any size to reduce risk, bring down costs and optimize returns.

The company set out to realize significant improvements in workflows and discipline integration using a new generation of engineering software to increase production efficiency in much larger complex projects.

In order to equip engineers from multiple disciplines with quick access to accurate project data and the ability to update new design modules into existing schematic drawings, the system had to be intuitive to work with existing project engineering tools and reflect accurate 2D schematic designs into 3D models. After an evaluation of the industrial engineering design tool market, Intergraph Smart 3D and Smart P&ID were selected for their ability to support real-time concurrent design updates, intelligent rules and relationships, task-based modeling and the creation of automated deliverables.

Read the entire case study to learn more about how GGE decreased time to complete remodeling from design changes and removed the chance of careless errors.