GetSmart Blog

27 Results for Tag Technology Provider

Doosan Heavy Industries & Construction Optimizes with Intergraph Smart Construction This case study explains how leading Korean EPC Doosan Heavy Industries & Construction achieved significant gains in project visibility, materials management, and decision-making capabilities using Intergraph Smart Construction.
Top 5 Reasons for Cost Blowouts on Asia-Pacific Construction Projects

While construction activity in Asia-Pacific continues to increase, budgets are becoming increasingly tighter, and project controllers are expected to do “more with less.” Across the board, these projects are facing similar challenges.

The Business Case for Project Controls

Maurizio M. Granata, business development executive for Materials, Costs, & Execution Management Solutions at Intergraph PP&M EMIA, discusses why project control is key for successful project delivery.

Four Facts About Decommissioning

More oil and gas fields around the world are coming to the end of their life cycle, while at the same time over 400 nuclear reactors worldwide have been retired from operation. What are the decommissioning challenges, opportunities, and what does engineering information have to do with it all?

Video: Bringing Together People, Process, Plant

The importance of Intergraph’s partnership with eVision is highlighted in this blog, featuring a new video with eVision’s chief operating officer and Intergraph’s Enterprise Program consultant.

Interference Management and the Intergraph Smart 3D Advantage In this blog post, Jai Singh Baghel, Group Lead at Technip discusses how Technip India manages clashes using Intergraph Smart 3D.
Captivating audiences in Malaysia, Korea and Japan!

Our 2016 annual conference series was held recently in three cities across Asia-Pacific.

Hyundai Engineering Achieves Significant Cost Savings with Intelligent Design Basis Verification

Leading Korean engineering company Hyundai Engineering has achieved cost savings of more than 20 percent in engineering rework man-hours on a multi-billion dollar petrochemical plant project with the Intelligent Design Basis Verification (IDBV) solution, a new customization for Intergraph Smart 3D that automates the process of verifying and confirming engineering design work.

Partnering to improve efficiency: Linde AG & Intergraph PP&M

Great ideas often take some time to find their perfect form. Since 2009, Intergraph Process, Power & Marine has collaborated with Linde AG - a world-leading supplier of industrial, process and specialty gases - to improve, test, and further develop Intergraph’s leading 3D solution, Intergraph Smart 3D.

Verena Schmidt, piping engineer at Linde AG, discusses Linde’s experiences and partnership with Intergraph PP&M.

Project Information Handover Challenges

Handover costs for a USD 1 billion facility can be up to USD 20 million. It is therefore critical for owner operators to achieve timely EPC handover and avoid production delays caused by incorrect or incomplete asset data. How can engineering software help?