GetSmart Blog

73 Results for Tag Engineering

CASE STUDY: Proplant Redesigns Extruder Valve Stand in Record Time Read how Slovakian engineering services provider improves project execution with Intergraph CADWorx & Analysis Solutions.
Visit Intergraph PP&M at AWP 2016 in Houston

Don't miss AWP 2016 on Oct. 4-5 in Houston, Texas, for your chance to connect with more than 300 attendees and sponsors and register to win an iPad from Intergraph PP&M, who is proud to once again be a conference sponsor.

Captivating audiences in Malaysia, Korea and Japan!

Our 2016 annual conference series was held recently in three cities across Asia-Pacific.

Powerful Design Technology from Altair in Partnership with PP&M

Altair has partnered with Intergraph Process, Power & Marine (PP&M) to create an interface that transfers a complete structural model from Intergraph Smart 3D software to Altair’s HyperMesh. This integrated interface will greatly increase the efficiency of marine vessel design and engineering for HyperMesh and Smart 3D users.

Hyundai Engineering Achieves Significant Cost Savings with Intelligent Design Basis Verification

Leading Korean engineering company Hyundai Engineering has achieved cost savings of more than 20 percent in engineering rework man-hours on a multi-billion dollar petrochemical plant project with the Intelligent Design Basis Verification (IDBV) solution, a new customization for Intergraph Smart 3D that automates the process of verifying and confirming engineering design work.

Partnering to improve efficiency: Linde AG & Intergraph PP&M

Great ideas often take some time to find their perfect form. Since 2009, Intergraph Process, Power & Marine has collaborated with Linde AG - a world-leading supplier of industrial, process and specialty gases - to improve, test, and further develop Intergraph’s leading 3D solution, Intergraph Smart 3D.

Verena Schmidt, piping engineer at Linde AG, discusses Linde’s experiences and partnership with Intergraph PP&M.

Project Information Handover Challenges

Handover costs for a USD 1 billion facility can be up to USD 20 million. It is therefore critical for owner operators to achieve timely EPC handover and avoid production delays caused by incorrect or incomplete asset data. How can engineering software help?

Save the Date for IUSA User Conference 2016!

September 21
LEARN. GROW. CONNECT.

Save the Date for IMEX User Conference 2016!

September 13
LEARN. GROW. CONNECT.

Streamlined construction planning: the megaproject Holy Grail

On many of today’s megaprojects, construction supervisors often spend large chunks of time negotiating their way around missing materials and information. Intergraph’s Pieter Dubbelman latest article explores the causes of this issue, and outlines some potential solutions.