Welcron Hantec Using ICAS Products for Biomass Plant

Plant at night

Read the entire case study here. 

Korean engineering and manufacturing company Welcron Hantec recently won a significant contract to perform the design, manufacturing, transportation, installation, and commissioning of one process in a 300TPA pilot biomass plant, which will later be scaled up to a 150,000TPA commercial-size plant. The pilot plant is required to perform many of the same processes as the commercial plant but on a smaller scale. 

The plant owner set a significant challenge for Welcron Hantec. In the technical meeting prior to the awarding of the contract, the owner demanded the project be completed in five months. As the shipping date had been fixed and they spent two months in the request for quotation process, all deliverables were required within three months – from piping and instrumentation drawings (P&IDs) approved for design, right through to delivery to the port transport facility.

After evaluating a number of competitive design solutions tailored to the small-to-medium sized plant market, Welcron Hantec selected the following products from the Intergraph CADWorx & Analysis Solutions range:

  • CADWorx Plant Professional, a complete set of tools for efficient 3D plant design
  • CADWorx P&ID Professional, which enables the creation of fully intelligent P&IDs

“We have been very impressed by the functionality of these CADWorx solutions, and the results they have provided,” said Welcron Hantec’s chief engineer, Sahnghyun Cho. “In the future, we hope to make CADWorx the company standard across Welcron Hantec, which will ensure we are getting the best results on all active projects.”

Learn more about the project and Welcron Hantec's use of ICAS solutions here.